Live Posture Tracking
Continuous monitoring and assessment preparation — CMMC L2. Technical SPRS projection from current findings. Formal CMMC status depends on assessor-reviewed evidence, approved scope, System Security Plan (SSP) completeness, and POA&M eligibility.
Projection, not formal assessment status
DoD PRA ICR OMB 0704-0677 lists a 525.955-hour average burden estimate for CMMC L2 certification assessment recordkeeping. As scans, scope, evidence, and remediation land, this view will advance automatically.
Setting up — your scope, scans, and evidence will populate this view as your security team configures the environment.
88+ out of 110 technical SPRS points; formal eligibility still requires evidence, scope, POA&M, and assessor review
Technical projection from current monitoring/finding state. Accepted evidence supports readiness, but does not change this score by itself.
Assessment Signal Map
Findings drive the technical projection. Accepted evidence supports the package and reviewer confidence; if a practice still has open technical findings, it remains outside the MET-supporting count until closure. Formal CMMC L2 status still depends on final dispositions, scope, System Security Plan (SSP), POA&M, and assessor review.
practices with open technical findings
accepted evidence with no open technical finding
practices still pending disposition
opens only after final dispositions
Domain-level scoring is not available for this framework snapshot yet. Use the current score, unresolved findings, practices, evidence status, and remediation plan as the current source of truth.
We need at least two score snapshots before drawing a trend. Current readiness above remains live.
Monitoring active